Sahdeniz 2 Project - Flare Assembly (Azerbaijan)
Starting Date: 25/06/2016
Ending Date: 26/09/2016
Equipments Used in the Project: In the project, one 1250 tonner (96-meter main boom, 72-meter y boom) and one 400 tonner (84-meter main boom) crawler crane were used.
Project Details: In Azerbaijan, steel construction chimney support lifting operation has been completed within the scope of Şahdeniz 2 Project carried out in the partnership of Azfen-Tekfen-Amec. In the project, a total of four flare stack modules, 113 tons and 45 meters, 100 tons and 39 meters, 82 tons and 32 meters and 75 tons and 29 meters, were successfully lifted and assembled on the top of each other.