Hyundai Steel Blok Taşıma/3.Boshoros Bridge Project
Starting Date: 02/20/2017
Ending Date: 02/22/2017
Equipments Used in the Project: 2X24 axles Goldhofer PST-SL-E
Project Details: 9 units of 24mx50m, 900 tonnes bridge floor which was on the land part, was transported by SPMT Trailer.