Bertling Iraq (Suleymaniye, Arbil, Dohuk)
Starting Date: 16/01/2013
Ending Date: 10/05/2016
Equipments Used in the Project: Transports were made for each ship with 128 axle hydraulic trailers and 8 axle prolonged low-bed vehicles
Project Details: The transport of gas turbines, generators and transformers weighing between 223 tons and 287 tons from İskenderun and Taşucu ports to the relevant construction yard; the transport of ninety six HRSG modules from İskenderun and Taşucu ports likewise. Approximately 55 ships' load has been transported.