Bakü Project - PLATFORM ASSEMBLY

Starting Date: 06.2014
Ending Date: 10.2017

Equipments Used in the Project : 4 no.s CC 2800 (600t. Crawler Crane), 2 no.s CC 2400 (400t. Crawler Crane), 1 no. LR 1300 (300t. Crawler Crane), 2 no.s LTM 1220 (220t. Telescopic A/T Crane), 2 no.s LTM 1130 (130t. Telescopic A/T Crane), 1 no.   LTM 1100 (100t. Telescopic A/T Crane), 6 no.s Terex A600 (60t. Telescopic R/T Crane)
24 axles Goldhofer SPMT, 2 no.s Power Pack Unit

Project Details : The Shah Denis 2 Platform Complex included a Productiond and Risers  paltform (SDB-PR), where the well production fluids will be recieved, processed and exported to the onshore terminal via seperate gas and liquid pipelines, and a Quartes and Utilities Platform (SDB-QU) bridge linked to PR.
Hareket was awarded to undetake the engineering and supervision of all heavy lifting and heavy transportation activities within the project. The heaviest load was drilling unit, which was 1150 tons.