Çimtaş Gölcük Çelik Köprü
Start Date: 8.02.2019
End Date: Project in progress
Equipment used in the project: Power unit 490 HP, 6 axle spmt flatbed, Power unit 490 HP, 6 axle spmt flatbed, 4 axle spmt flatbed, 4 axle spmt flatbed, 20 'Conveyer, 6m load spreader, 12m load spreader, equipment box
Project Description: The first 750ton steel shafts of 1915 Çanakkale Bridge were carried by HAREKET with two 16-axle Goldhofer self-propelled modular hydraulic trailers.