Şule Wind Power Plant Project
Start Date: October 2024
End Date: March 2025
Equipment Used in the Project: Blade trailer extendable up to 69 meters, 12-axle hydraulic trailer, tower adapter, beam pool hydraulic trailer, 650-ton crawler crane, 250-ton telescopic boom crane, 250-ton mobile crane, 200-ton mobile crane, 130-ton mobile crane
Project Description: HAREKET successfully completed the transportation and installation operations of wind turbines as part of the Şule Wind Power Plant Project in Turkey. The project was carried out at an altitude of 2,400 meters, in -25° cold, and under challenging terrain conditions.
A total of 11 sets of blades, each 81 meters long and weighing 84 tons, were transported 454 kilometers from Gemlik Port to the wind farm in Şarkikaraağaç, Isparta. Special bypass operations were conducted at bridges, intersections, and narrow passages along the route to ensure cargo safety and maintain coordination between the load, road, and transport vehicles.
Due to the blade length and generator weight, this project involved the installation of one of the largest wind turbine models in Turkey. The heavy lifting and installation operations were successfully completed.