Hareket's Signature at Senegal
Start Date: December 2020
Date of Completion: On going project
Equipment used in the project: Demag CC1800, CC1400, Kobelco CKE 2500, Senenbogen 55000 crawler cranes
Project Description: Hareket is serving as heavy lift contractor of Olympic Stadium Project located at Dakar city of Senegal. The Project consists of a 50.000 seat capacity olympic stadium covering a area measuring 88.000 m2 with a maximum height of 40 meters. Although the 2022 Youth Olympic Games, which will be hosted by Senegal, have been postponed to 2026 due to the pandemic, the project is still planned to be completed in 30 months.