Ne aramıştınız?

BASINDA BİZ

2025-03-10

Hareket is assigned to transport 2 unit 1256 ton port crane from Derince port to Evyap port

Due to lack of installation area at Evyap port, Evyap port decided to assemble the Liebherr port Cranes at Derince port and transport to Evyap port with barge and  roll-on and roll-of operation.